Documents
January 29, 2018
Municipality: Telavi
Donor: WB
Rehabilitation of Access Road to Hotel “Winiveria Ltd”, Telavi Muncipality
The Sub-project (SP) was a part of Public-Private Partnership (PPP) Program and envisaged rehabilitation of access road to Hotel “Winiveria Ltd”, Telavi Muncipality (total length -178 m).
January 29, 2018
Municipality: Gurjaani
Donor: WB
Rehabilitation works of access roads to the “Kakhetian Traditional Winery premises”, Gurjaani Municipality
The Sub-project (SP) was a part of Public-Private Partnership (PPP) Program and envisaged rehabilitation of existing access road (total length of 1920 m).
January 25, 2018
Municipality: Dusheti
Donor: WB
Urban Regeneration of Historical streets in Dusheti
The SP is implemented under the Third Regional Development Project (RDP III), supported by World Bank. The SP envisages rehabilitation of historic houses located at the Rustaveli, Erekle II, Shamanauri, Chavchavadze, Kostava and Saint Nino streets.
January 22, 2018
Municipality: Gurjaani
Donor: WB
Rehabilitation of Access Road and Infrastructure for Hotel and Restaurant in village Vejini, Gurjaani Municipality
The Sub-project (SP) was a part of Public-Private Partnership (PPP) Program and envisaged rehabilitation of the existing access road (length - 1200 m), water supply and sewer systems, installation of street lightning.
January 22, 2018
Municipality: Akhaltsikhe
Donor: WB
Arrangement of Tourism Infrastructure at Sapara Monastery, Akhaltsikhe Municipality
The SP “Arrangement of Tourism Infrastructure at Sapara Monastery” was implemented under the Third Regional Development (RDP III), supported by World Bank and envisaged: construction of a pavilion and the public toilet, restoration-reconstruction of old gate, decorative wall and rehabilitation of the old barn.
January 17, 2018
Municipality: Akhmeta
Donor: WB
Enhancing water supply system for village Omalo and arrangement of sewage system for hotel “Samzeo” in Omalo, Akhmeta Municipality, Tusheti
This Sub-project (SP) is a part of Public-Private Infrastructure (PPI) Investment Program and is delivered in support to Ltd “Samzeo”. The proposed SP envisages enhancing of the village water supply system, arrangement of the water supply and wastewater system for the hotel “Samzeo”.
January 15, 2018
Municipality: Tbilisi
Donor: ADB
Partial Compliance Report #2 on Sustainable Urban Transport Investment Program Tbilisi – (SUTIP – 2879-GEO) 3063 Tbilisi – Rustavi Urban Link – Section 2 Part A SUB-SECTIONS: 4+000 – Km 4+100; (ii) Km 4+400 to Km 4+700; (iii) Km 5+100 – Km 5+300; (iv) Km 6+800 to Km 7+800; (v) Km 8+300 to Km 8+600 and (vi) Km 9+700 – Km 9+950
Document prepared by External Monitoring Specialist, that confirms MDFG carried out the resettlement procedures in accordance with requirements of ADB SPS (2009) and Georgian legislation on the Tbilisi – Rustavi Urban Link Section 2 Part A.
January 11, 2018
Municipality: Dusheti
Donor: WB
Urban Regeneration of Historical streets in Dusheti
The subproject will be implemented under the Third Regional Development Project (RDP III), supported by World Bank.
December 21, 2017
Municipality: Adigeni
Donor: WB
Rehabilitation of Abastumani Historical Wooden Houses
The SP will be implemented under the Third Regional Development Project (RDP III), supported by World Bank. The SP envisages rehabilitation of 17 residential houses located on Shota Rustaveli Street (#56, #58, #62, #64, #66, #68, #70, #72, #76, #78, #80, #84, #94, #96, #100, #102, and #104).
December 19, 2017
Municipality: Mtskheta
Donor: WB
Rehabilitation of road and arrangement of parking at Zedazeni Monastery
The SP is implementing under the Third Regional Development (RDP III), supported by World Bank.
Under the present sub-project (SP), it is planned to rehabilitate the access road to the Zedazeni Monastery in Mtskheta Municipality. The road starts from village Saguramo and ends on the adjacent territoriy to the Zedazeni Monastery. The whole length of the rehabilitative road is 6305 m.
Under the present sub-project (SP), it is planned to rehabilitate the access road to the Zedazeni Monastery in Mtskheta Municipality. The road starts from village Saguramo and ends on the adjacent territoriy to the Zedazeni Monastery. The whole length of the rehabilitative road is 6305 m.