Documents

November 16, 2018
Municipality: Tbilisi
Donor: ADB

Initial Environmental Examination (IEE) document for Detailed Design of Marshal Gelovani Avenue and Right Bank Intersection (SUTIP 2)

Development of a sustainable urban transport network is a key component for the development of urban areas in Georgia which can enhance the role of Tbilisi as an important business center in the South Caucasus region.
August 24, 2018
Municipality: Aspindza
Donor: WB

Arrangement of Tourism Infrastructure at Vani Kvabebi (caves) in Aspindza Municipality

The SP “Arrangement of Tourism Infrastructure at Vani Kvabebi (caves)” was implemented under the Third Regional Development Project (RDP III), supported by World Bank. The SP envisaged arrangement of visitor center, public toilet, parking areas, recreational platform and applying of safety measures at the monument.
July 27, 2018
Municipality: Aspindza
Donor: WB

Rehabilitation of Access Road to Village Mirashkhani in Aspindza Municipality

The SP was implemented under the Third Regional Development (RDP III), supported by World Bank. Under the presented sub-project (SP), it was planned to rehabilitate access road to village Mirashkhani. The length of road to be rehabilitated is 3600 m and the width is 5 m.
May 17, 2018
Municipality: Tbilisi
Donor: ADB

Partial Compliance Report #2 on Sustainable Urban Transport Investment Program Tbilisi – (SUTIP – 2879-GEO) 3063 Tbilisi – Rustavi Urban Link – Section 2 Part B SUB-SECTIONS: KM 5+300 to KM 5+400

Document prepared by External Monitoring Specialist, that confirms MDFG carried out the resettlement procedures in accordance with requirements of ADB SPS (2009) and Georgian legislation on the Section 2 Part B. the Tbilisi – Rustavi Urban Link Section 2 Part B
May 17, 2018
Municipality: Tbilisi
Donor: ADB

Partial Compliance Report #1 on Sustainable Urban Transport Investment Program Tbilisi – (SUTIP – 2879-GEO) 3063 Tbilisi – Rustavi Urban Link – Section 2 Part B SUB-SECTIONS: 5+400 to KM 6+800

Document prepared by External Monitoring Specialist, that confirms MDFG carried out the resettlement procedures in accordance with requirements of ADB SPS (2009) and Georgian legislation on the Section 2 Part B. the Tbilisi – Rustavi Urban Link Section 2 Part B
May 14, 2018
Municipality: Batumi
Donor: ADB

Updated Initial Environmental Examination (IEE) document for updated Batumi Coastal Protection Project

Coastal improvement is one of the priorities among other infrastructural projects, which will facilitate the future development of the Batumi City and region.

May 10, 2018
Municipality: Tbilisi
Donor: ADB

Compliance Report on Sustainable Urban Transport Investment Program Tbilisi – Rustavi Urban Link – Section 2 Part B. SUB-SECTIONS: KM 5+300 to KM 5+400; KM 5+400 to KM 6+800

May 10, 2018

Document prepared by External Monitoring Specialist, that confirms MDFG carried out the resettlement procedures in accordance with requirements of ADB SPS (2009) and Georgian legislation on the KM 5+300 to KM 5+400 and KM 5+400 to KM 6+800 of the Tbilisi – Rustavi Urban Link – Section 2 Part B.
April 28, 2018
Municipality: Kobuleti
Donor: WB

Rehabilitation of Kobuleti Seawall

The Sub-project – „Rehabilitation of Kobuleti Seawall“, is being implemented under the Second Regional and Municipal Development Project (RMIDPS) supported by the World Bank. The SP envisages dismantling of the old protection wall and arranging instead coast protection stepped wall with the length of 1900 meters and improvement of the boulevard site in the coastline of Kobuleti City.
April 27, 2018
Municipality: Azhara
Donor: ADB

Batumi Coastal Protection Project

Batumi Coastal Protection Project
Public consultation meeting on
Drafts of Updated Initial Environmental Examination and Gender Related Issues;
Community Health and Safety Action Plan for Opening the Beach during Summer Season 2018.

On May 4th, 15:00
(Batumi City Hall)

On May 4th, 2018, at 15:00 in Batumi City Hall (Address: 25 Luka Asatiani Street) Public Consultation Meeting on updated draft of Updated Initial Environmental Examination and Gender Related Issues, Community Health and Safety Action Plan for Opening the Beach during Summer Season 2018 will be held for the “Batumi Coastal Protection” sub-project.
April 17, 2018
Municipality: Tskaltubo
Donor: SIDA

The Sustainable Wastewater Management Project Construction and Operation of Tskaltubo Wastewater Treatment Plant Environmental Impact Assessment Report

The Sustainable Wastewater Management Project is financed by the Government of Sweden through Swedish International Development Cooperation Agency (SIDA), administered by the World Bank and implemented by the Municipal Development Fund of Georgia (MDF). The Project consists construction of two wastewater treatment plants (WWTPs). Present Environmental Impact Assessment (EIA) report is for the construction and operation of Tskaltubo WWTP with the capacity of 6171 m3/d.