Landfill cleaning recovery procedures are under implementation at village Vardisubani
By World Bank financing construction waste landfill cleaning- recovery works are implemented by Municipal Development fund of Georgia in village Vardisubani located at town Telavi entrance. Total cost of the works amounts to GEL1 580 210, 57. Existing landfill was harmful to local population health and threatened ecology. Adjacent territory was entirely polluted. Since recovery –cleaning of the landfill ecological threat will be totally eliminated. 25 workmen is hired on civil works. Mentioned works were visited by MDF executive director Juansher Burchuladze and first deputy minister of Regional Development and Infrastructure Ilia Darchiashvili.
Within the framework of the project construction waste was removed from 2 km of the territory in particular from Vaziani-Gombori-Telavi highway km 65-km67. Also silt was removed from Matsantsarakhevi river bed. In addition safety gabions and embankment were arranged from river Matsantsarakhevi side, and improvement and landscaping of the territory between highway and gabions is planned. As a result of mentioned works existing ecological problems will be totally resolved and threat to local population health will be eliminated. Civil works commenced on December 24 2014 and will be finalized in autumn of 2015.